INSERVICE INSPECTION PROGRAMS
- Performed comprehensive Inservice Inspection (ISI) Program Updates in accordance with 10CFR50.55a at Fermi, Turkey Point Units 3 & 4, McGuire Units 1 & 2, Oconee Units 1, 2 & 3, Columbia, Seabrook, Duane Arnold, Peach Bottom Units 2 & 3, Arkansas Nuclear One Units 1 & 2, Pilgrim, St. Lucie Units 1 & 2, Callaway (2nd, 3rd and 4th Intervals), San Onofre Units 2 & 3, Comanche Peak Units 1 & 2, River Bend, Grand Gulf, Waterford, Calvert Cliffs Units 1 & 2, South Texas Project Units 1 & 2, Dresden Units 2 & 3, Browns Ferry Unit 3, Millstone Units 2 & 3, Sizewell B, Shearon Harris, Braidwood Units 1 & 2, Byron Units 1 & 2, Wolf Creek (2nd, 3rd and 4th Intervals), Indian Point Units 2 & 3, Zion Units 1 & 2, Quad Cities Units 1 & 2, North Anna Units 1 & 2, Three Mile Island 1, Krško, Koeberg Units 1 & 2 and V.C. Summer (3rd and 4th Intervals). The Program Updates typically included the following tasks:
- Generated ISI Plan for submittal to NRC
- Evaluated previous interval ISI Programs to verify compliance
- Evaluated and summarized ASME Section XI Code and Code Case requirements
- Evaluated 10CFR50.55a Limitations and Modifications
- Prepared Relief Requests and supporting technical bases
- Evaluated and prepared Augmented Inspection Programs
- Determined ISI classification boundaries and prepared basis documentation
- Performed ISI walkdowns
- Prepared ISI and containment ISI drawings
- Generated detailed databases
- Updated Code and FSAR commitments
- Scheduled welds and components for inspection and prepared basis documentation
- Provided Project Management
- Generated Basis Documents which summarized ISI Program documentation
- Interfaced with regulatory and inspection agencies
· Maintained ISI Programs at Callaway, Seabrook, Comanche Peak, ANO Unit 2, South Texas Project, and Shearon Harris
- Planned and scheduled inservice inspections
- Defended ISI Program to NRC staff at regional level and headquarters
- Maintained the Augmented ISI Program
- Collaborated on more efficient ways of meeting ISI commitments while supporting shorter outages
· Performed comprehensive ISI Program third party reviews for the Catawba, South Texas Project, Harris, McGuire, Columbia Oconee, Perry, Hatch and all Commonwealth Edison stations
· Provided ISI staff augmentation at Callaway, Comanche Peak, Seabrook, Susquehanna, Cooper, Dresden, South Texas Project, Sizewell B and Limerick
· Developed and reviewed PWR vessel head examination programs
· Collaborated on industry effort to address the inspection of RPV shell welds through BWR Vessel and Internals Project
· Provided on-site training on ASME Section XI, inservice inspection, repair/replacement and inservice testing for all Carolina Power and Light plants, Salem, Hope Creek, Exelon, TVA and the Pilgrim Station. Similar training provided to numerous utilities at annual Inservice Engineering ASME Section XI Training Workshop
· Provided on-site outage support at numerous stations
· Performed preservice inspections at South Texas Project and inservice inspections at ANO Units 1 & 2, St. Lucie Units and South Texas Project