REPAIRS/REPLACEMENTS
- Developed Repair/Replacement Programs at ANO, Seabrook, Grand Gulf, River Bend, Waterford, Sizewell, Seabrook, Turkey Point and St. Lucie
- Applied weld overlays at the Hatch, Brunswick, Dresden, Quad Cities and McGuire stations
- Coordinated resolution of flaw evaluations and weld overlay applications at Plant Hatch
- Prepared numerous ASME Section XI Repair Plans for Dresden, Quad Cities, Hatch, Hanford N-Reactor, and Brunswick stations
- Supported large scale Intergranular Stress Corrosion Cracking piping replacement projects at Dresden Unit 3 and Peach Bottom Unit 3
- Prepared specifications for nondestructive examinations, welding and materials
- Developed welding parameters and assisted with procedure qualification
- Prepared repair programs for piping, valves, containment and RPV nozzles
- Prepared installation bid specification and managed bid evaluation process
- Provided on-site support as night engineering and construction supervisor at Peach Bottom
- Prepared contingency plans for remaining piping
- Performed numerous walkdowns
- Prepared Section XI Replacement Plans
- Performed various small scale replacement projects at Dresden and Quad Cities stations
- Piping replacements in reactor water clean-up, main steam drain and recirculation drain lines
- Valve replacements in reactor water clean-up, main steam drain and head spray lines
- Bellows replacements in core spray lines
- Support replacements in low pressure coolant injection, high pressure coolant injection, shutdown cooling and standby liquid control systems